Main Contractor (also assuming PSCS role) for Permanent Accommodation at Scoil Ruain
Value
€1
Deadline
12 Oct
12 Oct 2026
Value
€1
Deadline
12 Oct
Main contractor to build permanent accommodation at Scoil Ruain, Killenaule, Thurles, Co. Tipperary, including ASD units, music room, and classrooms, also acting as PSCS.
Construction of permanent accommodation including ASD units, music room, and classrooms at Scoil Ruain, Co. Tipperary.
Bidder profile
Established main contractors with significant turnover, experience in educational construction, and robust H&S management systems, capable of fulfilling both construction and PSCS roles.
Risks & flags
- Contractor acting as both Main Contractor and PSCS
- Potential H&S categorisation mismatch (Type 1 vs scope)
- Mandatory self-supply of site power
- Specific insurance extensions required for PSCS role
- High emphasis on price (70% MEAT split)
Briefing
AI-generated analysis of the documents. Check the official notice and any amendments for current submission details.
1. At a glance
| Buyer | Tipperary Education and Training Board |
|---|---|
| Title | Main Contractor (also assuming PSCS role) for Permanent Accommodation at Scoil Ruain |
| CPV / category | 45214200-2 (Construction work for school buildings) |
| Estimated value | Not disclosed |
| Per-year | Not stated |
| Procedure type | Open Procedure |
| Lots | Not applicable |
| Location | Killenaule, Thurles, Co. Tipperary, Ireland |
| Contract length | Not stated (implied by project duration) |
| Submission deadline | Not stated (refer to eTenders advertisement) |
| Go-live / start | Not stated (implied by project duration) |
2. Scope of Work
This tender seeks a Main Contractor to undertake construction works at Scoil Ruain, Killenaule, Thurles, Co. Tipperary. The contractor will also assume the role of Project Supervisor for the Construction Stage (PSCS). The project involves the construction of permanent accommodation, including two Autism Spectrum Disorder (ASD) units, one music room, and five general classrooms. The scope encompasses all building works, civil engineering, structural, mechanical, and electrical installations as detailed in the tender documents.
Key activities and deliverables include:
- Construction of New Facilities:
- 2 x Autism Spectrum Disorder (ASD) Units
- 1 x Music Room
- 5 x General Classrooms
- Associated Works:
- Civil and Structural Engineering
- Mechanical and Electrical installations
- Builders' works, including but not limited to:
- Shaft plumb to EN81 clause 5.3 tolerance (+25mm/-0mm).
- Recesses for door equipment on landings.
- Forming recesses for lift equipment entry.
- Provision of off-loading and secure storage for lift equipment.
- Ensuring safe access for lift equipment.
- Scaffolding provision and safety measures (fully boarded, toe boards).
- Scaffoldless installation measures for protection.
- Datum line at each entrance.
- Machine slab cast with reinforcement.
- Ensuring shaft and pit are dry, cleared, and level.
- Toe boards and barriers at landings for shaft safety.
- Painting of lift shaft walls and pit floor.
- Smoke vent at the top of the shaft (minimum 1% of horizontal section as per EN81-1 clause 5.2.3).
- Cut-outs for call buttons and position indicators.
- Making good in shaft and around landing entrance equipment.
- Shuttering around door frames and sills.
- Fire stopping in the lift shaft.
- Pit ladder installation.
- Supply and installation of lifting beams in the machine room.
- Disposal of wooden lift packing cases.
- Electrical Builders' Works:
- Ground Penetrating Radar (GPR) survey for existing underground services.
- Vertical chases in masonry walls for outlets, switches, and miscellaneous electrical items.
- Service entry through external masonry walls and concrete floors.
- Coring openings through internal walls and concrete slabs.
- Construction of electrical service risers.
- Installation of proprietary service riser access hatches.
- Fitting timber grounds/backing board over tile ceilings for light fittings, emergency fittings, smoke detectors, sounders.
- Replacement of damaged ceiling tiles.
- Forming concrete plinths/bases for equipment.
- External works including trenching, duct laying, and backfilling for ESB, ELV, and LV power cables.
- Installation of public lighting fixtures, bollard lights, and recessed wall lights.
- Redecoration of new services in the existing school.
- Suspended ceiling repairs.
- Project Supervision: Acting as Project Supervisor for the Construction Stage (PSCS) in accordance with Safety, Health and Welfare at Work (Construction) Regulations.
- Health & Safety: Compliance with Preliminary Health & Safety Plan and specific PSCS requirements.
- Climate Obligations: Reporting on the energy efficiency improvements and contribution to climate obligations as per Tipperary ETB Green Public Procurement Policy.
- Documentation: Submission of a Schedule of Maintenance, Warranties & Demonstrations, and an Electrical Services Safety File.
3. Background & buyer context
This procurement is initiated by Tipperary Education and Training Board (ETB) to provide enhanced educational facilities at Scoil Ruain in Killenaule. The project aligns with the ETB's commitment to improving educational infrastructure and providing specialized learning environments. The construction of ASD units, music rooms, and general classrooms addresses specific needs within the school sector, likely driven by increased demand for inclusive education and expanded curriculum offerings. The tender documents reference the Public Works Contract for Building Works designed by the Employer, a standard framework for public sector construction projects in Ireland. The project is categorised as Type 1 for Health & Safety competence assessment, indicating it is valued under €500,000 with no special H&S considerations, though this may be a default and requires confirmation based on the final contract value.
4. Eligibility & selection criteria
Bidders must meet the following minimum requirements to be considered:
- Turnover Requirement:
- Minimum Yearly Turnover arising from General Construction: €7,500,000 (combined total turnover for all members of a consortium).
- Insurance:
- Public Liability Insurance: Minimum indemnity limit of €6,500,000 for any one event.
- Employers Liability Insurance: Minimum indemnity limit of €13,000,000 for any one event. No excess permitted.
- Professional Indemnity Insurance: Minimum indemnity limit of €1,600,000 annual aggregate limit, kept in place for 12 years after Substantial Completion. Maximum excess: 2% of annual turnover or €5,000, whichever is greater.
- Product Liability Insurance: Minimum of €6.5m for the specialist supplier of the attenuation system.
- Contractors All-risks insurance.
- A non-vitiation clause (public and products liability insurance).
- Indemnity to Principal (Tipperary Education & Training Board).
- TETB joint insured under contract works insurance and additional insured under public and products liability insurance.
- Insurance extended to include the role of PSCS.
- Certifications:
- Health & Safety Management System: In accordance with ISO 45001:2018 or equivalent.
- Environmental Product Declarations (EPDs): Required per EN 15804 standard or equivalent.
- Third-party certifications (ISO 14001, SEAI accreditation, EMAS, etc.) are preferred.
- Registered Charity Number: 20083595 (for Tipperary ETB).
- Past Experience:
- Evidence of satisfactory project execution and delivery of services (details to be provided in Appendices B1, B2, B3).
- The contractor shall employ a consulting engineer with Professional Indemnity Insurance of €6.5m for temporary works proposals.
- All specialists supplying design products and ancillary design certificates must carry Professional Indemnity Insurance to the value of €6.5 million.
- The specialist designer of the attenuation system must carry Professional Indemnity Insurance to €2.5m.
- The professional Geologist must carry a minimum of €2.6m PI Insurance.
- Temporary Work's Engineer to be a Chartered Civil/Structural Practice with minimum €6.5m professional indemnity insurance.
- Personnel:
- Consulting Engineer for temporary works: Professional Indemnity Insurance of €6.5m.
- Professional Geologist: Minimum €2.6m PI Insurance.
- Site Engineer: Currently licensed by the Institution of Engineers of Ireland (IEI), with a minimum of five years' experience as an approved Site Engineer.
- Geographic / Facility Constraints: Not specified.
5. Award criteria & scoring
The contract will be awarded on the basis of Most Economically Advantageous Tender (MEAT).
| Criterion | Weight (%) | Sub-criteria | Pass/Fail Thresholds |
|---|---|---|---|
| Price | 70% | Not specified | Not specified |
| Technical | 30% | Not specified | Not specified |
A minimum scoring threshold per criterion or overall is not explicitly stated, but tenders must be compliant. The lowest or any tender is not necessarily accepted.
6. Submission requirements
Bidders must submit the following completed documents:
- Signed Appendix A - European Single Procurement Document (ESPD).
- Completed Appendix B1 - List of Previous Works Projects which is CEE.
- Completed Appendix B2 - Certificate of Satisfactory Project Execution.
- Appendix D1 - QW1 Letter of Undertaking Bond.
- Signed QW_Part_2_v1.1.
- Signed Volume B Form of Tender and Schedule.
- Volume C Pricing Document and Schedule of Prices.
- A Current Tax Clearance Certificate or statement of suitability on tax grounds for non-residents.
- Evidence of compliance with sectoral employment orders, employment regulation orders, or registered employment agreements.
- Evidence of current insurance cover as specified.
- Tender documentation must be zipped prior to return via eTenders.
Mandatory Site Visit:
- Site visits can be arranged by contacting Principal James Williams on 087-9927513 or 052 9156332.
- Tenderers must supply their own power via their own generator; connection to the school's supply is prohibited.
Submission Portal:
- Electronic soft copy via the eTenders tender box only.
- Tenders submitted in any other manner (post, hand, email) will be invalid.
- An unsigned Form of Tender will be invalid.
7. Key dates & process
| Event | Date/Time |
|---|---|
| RFT issued | Not stated (implied by document dates) |
| Clarification deadline | Not later than 5 working days before tender deadline |
| Mandatory site visit | Not specified (visits can be arranged) |
| Tender deadline | Not stated (refer to eTenders advertisement) |
| Expected award | Not stated |
| Contract start | Not stated |
| Go-live / mobilisation | Not stated |
8. Contract terms that matter
- Contract Type: Public Works Contract for Building Works designed by the Employer.
- Payment Terms: Not specified.
- SLAs/KPIs: Not specified.
- Liquidated Damages: Not specified.
- Termination Clauses: Not specified.
- IP Ownership: Not specified.
- Sub-contracting: All sub-contractors are domestic.
- Guarantees/Bonds: Letter of Undertaking Bond required.
- Defects Liability Period: 12 months for electrical installations, including routine and preventative maintenance.
9. Risks, red flags & unusuals
- PSCS Role: The contractor is required to act as both Works Contractor and Project Supervisor for the Construction Stage (PSCS). This dual role requires careful management of health and safety responsibilities alongside construction delivery.
- H&S Categorisation: The project is initially categorised as Type 1 (<€500,000 with no special H&S considerations). However, the scope of works (multiple classrooms, ASD units, music room, lift installation) suggests the final value may exceed this threshold, potentially requiring a Type 2 or Type 3 assessment. Bidders should verify the correct H&S category.
- Site Power: Tenderers must supply their own power and cannot connect to the school's supply, adding logistical and cost considerations.
- Insurance Requirements: Specific extensions for the PSCS role and joint insured status for Tipperary ETB are mandated, requiring careful confirmation with insurers.
- MEAT Split: The award is based on 70% Price and 30% Technical, indicating a strong emphasis on cost competitiveness.
10. SME fit assessment
This tender is structured for established building contractors with experience in educational facilities and a proven track record in managing construction projects of this scale.
- Credible Bidders: Firms with a minimum annual turnover of €7.5 million in general construction, demonstrating experience in similar educational projects, and possessing robust health and safety management systems (ISO 45001) are well-suited. Experience in managing both construction and PSCS roles is essential.
- Consortium/Sub-contracting: Consortium bids are permitted, with turnover requirements applying to the combined total. Sub-contractors are domestic.
- Bid-Prep Effort: Significant effort is required due to detailed technical specifications, insurance requirements, H&S documentation, and the need to price comprehensive builders' works schedules for electrical, mechanical, and lift installations. An estimate of 10-15 days of focused effort by a bid team is reasonable.
- Pwin Signal: The tender is open, but the specific requirements for insurance, turnover, and the dual PSCS role may limit the pool of eligible bidders. The 70/30 price/technical split suggests that while technical capability is important, competitive pricing will be a key differentiator. There is no explicit indication of an incumbent contractor.
11. Where to dig deeper
- Source RFT Filename: Invitation to Tender.pdf
- eTenders CFT ID: 8843560
- Contact: Clarifications via eTenders messaging service. Site visits: James Williams on 087-9927513 or 052 9156332.
- Key Attachments:
- 3.4.1-HS-Works-Contractor_v3.1-25-11-2025
- 3.4.2-HS-PSCS_v3.1-25-11-2025
- Volume B Form of Tender and Schedule
- Volume C Pricing Document
Can you bid?
Required certifications
- ISO 45001:2018
- EN 15804
Minimum turnover
€7,500,000
Public liability insurance
€6,500,000
Professional indemnity insurance
€1,600,000
Named standards / methodologies
Scoring
Most Economically Advantageous Tender
Documents (306)
1531-SPE-Rev T2 - Volume A Works Requirements - Electrical Specification.pdf
647.4 KB · Specification
1531-SPL-Rev T2 - Volume A Section 3 Works Requirements - Lift Specification.pdf
317.7 KB · Specification
1531-SPM-Rev T2 Volume A Section 1 - Works Description - Mechanical Specification.pdf
750.2 KB · Specification
15KK040 Project C&S Specification P2_230530.pdf
858.9 KB · Specification
T-15-136-SP-01_Architects Specification.pdf
1.1 MB · Specification
Invitation to Tender.pdf
278.4 KB · RFT / Invitation to Tender
Preliminaries (Not for Pricing).pdf
571.3 KB · Pricing / BOQ / Schedule of Rates
Volume C - Pricing Document (CUBIT).CBX
1.2 MB · Pricing / BOQ / Schedule of Rates
Volume C - Pricing Document (EXCEL).xlsx
510.4 KB · Pricing / BOQ / Schedule of Rates
Volume C - Pricing Document.pdf
5.1 MB · Pricing / BOQ / Schedule of Rates
3.4.1-HS-Works-Contractor_v3.1-25-11-2025.docx
51.2 KB · Contract / Agreement / Terms
PW-CF1_Agreement_A2_09-12-2019.docx
31.9 KB · Contract / Agreement / Terms
Appendix_B2_Certificate_of_Satisfactory_Project_Execution.docx
26.0 KB · Form / Declaration / Certificate
Appendix_B3_Certificate_of_Satisfactory_Delivery_of_Services.docx
25.6 KB · Form / Declaration / Certificate
CIF_Ancillary_Certificates_(14th_November_2014).pdf
243.2 KB · Form / Declaration / Certificate
Specialist_Ancillary_Certificates_(14th_November_2014)-2.pdf
209.9 KB · Form / Declaration / Certificate
15KK040 Drawing Register - Str Rebar.pdf
41.9 KB · Drawing / Plan / Layout
15KK040 Drawing Register - Structural.pdf
29.3 KB · Drawing / Plan / Layout
15KK040-C-001 Existing Site Layout-P1.pdf
787.1 KB · Drawing / Plan / Layout
15KK040-C-002 Proposed Site Layout-P4.pdf
553.0 KB · Drawing / Plan / Layout
15KK040-C-003 Traffic Signs & Road Markings Layout-P2.pdf
603.5 KB · Drawing / Plan / Layout
15KK040-C-004 Proposed Build Ups Layout-P2.pdf
618.3 KB · Drawing / Plan / Layout
15KK040-C-005 External Works Layout-P2.pdf
531.9 KB · Drawing / Plan / Layout
15KK040-C-010 Proposed Foul Layout-P3.pdf
540.7 KB · Drawing / Plan / Layout
15KK040-C-015 Proposed Watermain Layout-P2.pdf
545.1 KB · Drawing / Plan / Layout
15KK040-C-020 Proposed Storm Drainage Layout-P2.pdf
507.9 KB · Drawing / Plan / Layout
15KK040-C-070 LPG Fuel Storage Compound Layout & Details-P3.pdf
626.2 KB · Drawing / Plan / Layout
15KK040-C-071 LPG Fuel Storage Compound Layout & Details-P3.pdf
400.1 KB · Drawing / Plan / Layout
15KK040-C-072 LPG Fuel Storage Compound Layout & Details-P2.pdf
407.3 KB · Drawing / Plan / Layout
15KK040-R-070 Lower Ground Floor U-Blocks & Cill Layout.pdf
268.3 KB · Drawing / Plan / Layout
15KK040-R-071 Ground Floor U-Blocks & Cill Layout.pdf
433.3 KB · Drawing / Plan / Layout
15KK040-R-072 Roof Floor U-Blocks & Cill Layout.pdf
363.5 KB · Drawing / Plan / Layout
15KK040-R-100 Lower Ground Floor Rising Elements Layout.pdf
215.3 KB · Drawing / Plan / Layout
15KK040-R-101 Ground Floor Rising Elements Layout.pdf
278.8 KB · Drawing / Plan / Layout
15KK040-S-001 Foundation Layout Rev P4.pdf
561.2 KB · Drawing / Plan / Layout
15KK040-S-002 Lower Ground Floor Layout Rev P4.pdf
821.5 KB · Drawing / Plan / Layout
15KK040-S-003 Ground Floor Layout-P4.pdf
867.1 KB · Drawing / Plan / Layout
15KK040-S-004 Roof Layout-P4.pdf
643.4 KB · Drawing / Plan / Layout
15KK040-S-056 Wall Tie Layout - Detail Sht- P2.pdf
211.8 KB · Drawing / Plan / Layout
D-15-136-02_ Existing Site Plan_1-200_A1.pdf
3.1 MB · Drawing / Plan / Layout
D-15-136-04_ Proposed Site Plan_1-200_A1.pdf
2.9 MB · Drawing / Plan / Layout
D-15-136-07_ Proposed Elevations_1-100_A1.pdf
591.1 KB · Drawing / Plan / Layout
Drawing Register - Civil Rebar.pdf
14.1 KB · Drawing / Plan / Layout
Drawing Register - Civil.pdf
29.3 KB · Drawing / Plan / Layout
F-15-136-02_Existing Site Plan_1-250_A1.pdf
3.1 MB · Drawing / Plan / Layout
F-15-136-04_Proposed Site Plan_1-200_A1.pdf
2.9 MB · Drawing / Plan / Layout
F-15-136-05-B_Proposed Floor Plans (1)_1-200_A1.pdf
4.6 MB · Drawing / Plan / Layout
F-15-136-08-A_Proposed Elevations_1-100_A1.pdf
778.4 KB · Drawing / Plan / Layout
F-15-136-12-B_Proposed Elevations&Sections_1-100_A1.pdf
310.0 KB · Drawing / Plan / Layout
F-15-136-13-B_Proposed Elevations&Sections_1-100_A1.pdf
1.6 MB · Drawing / Plan / Layout
T-15-136-02_ Existing Site Plan_A1_1-200.pdf
2.6 MB · Drawing / Plan / Layout
T-15-136-05_Proposed Site Plan_1-250_A1.pdf
2.2 MB · Drawing / Plan / Layout
T-15-136-08_Proposed Elevations_A1_1-100.pdf
1.4 MB · Drawing / Plan / Layout
T-15-136-09_Proposed Elevation-Cross Sections Sheet 1_A1_1-100.pdf
2.1 MB · Drawing / Plan / Layout
T-15-136-10_Proposed Elevation-Cross Sections Sheet 2_A1_1-100.pdf
2.1 MB · Drawing / Plan / Layout
T-15-136-28_Proposed Landscaping Layouts & External Details_A1.pdf
770.0 KB · Drawing / Plan / Layout
15-136_Scoil Ruain Tender Issue Sheet_26.06.26.pdf
245.5 KB
15-136_Scoil Ruain-Killenaule_Inspection_Notification_Framework_INF.pdf
148.3 KB
15-136_Scoil Ruain-Killenaule_Preliminary_Inspection_Plan_PIP.pdf
98.1 KB
1531 Electrical Drawing & Document Schedule & Issue Sheet.pdf
67.7 KB · Appendix / Annex
1531 Lift Transportation Drawing & Document Schedule & Issue Sheet.pdf
28.7 KB · Appendix / Annex
1531 Mechanical Drawing & Document Schedule & Issue Sheet.pdf
37.8 KB · Appendix / Annex
1531- Mechanical Builders Works Schedule Rev-T2.pdf
135.3 KB · Appendix / Annex
1531-BW-01-Rev-T3 - 18.06.2026.pdf
1.4 MB
1531-BW-02-Rev-T2 - 18.06.2026.pdf
1.4 MB
1531-EF-01-Rev-T2 - 18.06.2026.pdf
2.4 MB
1531-EL-01-Rev-T2 - 18.06.2026.pdf
1.5 MB
1531-EL-02-Rev-T2 - 18.06.2026.pdf
881.7 KB
1531-Electrical Builders Works Schedule Rev-T2 18.06.2026.pdf
425.9 KB · Appendix / Annex
1531-EP-01-Rev-T2 - 18.06.2026.pdf
1.4 MB
1531-EP-02-Rev-T2 - 18.06.2026.pdf
1.0 MB
1531-EP-03-Rev-T2 - 18.06.2026.pdf
1.2 MB
1531-EP-04-Rev-T2 - 18.06.2026.pdf
2.0 MB
1531-ES-01-Rev-T2 - 18.06.2026.pdf
217.7 KB
1531-ESCH-01 MCB Board Schedules T2 18.06.2026.pdf
145.0 KB
1531-ESOP-Rev T2 Volume C Section 1 - Electrical Schedule of Prices.pdf
358.6 KB · Appendix / Annex
1531-EX-00-Rev-T2 - 18.06.2026.pdf
515.3 KB
1531-EX-01 SHEET 1-Rev-T2 - 18.06.2026.pdf
1.1 MB
1531-EX-01 SHEET 2-Rev-T2 - 18.06.2026.pdf
648.0 KB
1531-EZ-01-Rev-T2 - 18.06.2026.pdf
705.7 KB
1531-Lift Builders Works Schedule Rev T2 16.06.2026.pdf
97.7 KB · Appendix / Annex
1531-LSOP-Rev T2 Volume C Section 3 - Lift Schedule of Prices.pdf
139.1 KB · Appendix / Annex
1531-MD-01-Rev-T3 - 18.06.2026.pdf
1.5 MB
1531-ME-01-Rev-T2 - 18.06.2026.pdf
1.2 MB
1531-MG-01-Rev-T2 - 18.06.2026.pdf
238.6 KB
1531-MH-01-Rev-T2 - 18.06.2026.pdf
347.1 KB
1531-MH-02-Rev-T3 - 18.06.2026.pdf
2.3 MB
1531-MH-03-Rev-T3 - 18.06.2026.pdf
266.1 KB
1531-MS-01-Rev-T3 - 18.06.2026.pdf
326.2 KB
1531-MS-02-Rev-T2 - 18.06.2026.pdf
193.7 KB
1531-MSOP-Rev-T3 Volume C Section 2 - Mechanical Schedule of Prices.pdf
336.4 KB · Appendix / Annex
1531-MV-01-Rev-T2 - 18.06.2026.pdf
1.0 MB
1531-MW-01-Rev-T3 - 18.06.2026.pdf
1.2 MB
1531-MX-00-Rev-T2 - 18.06.2026.pdf
531.0 KB
1531-MX-01-Rev-T2 - 18.06.2026.pdf
1.6 MB
1531-PA-01-Rev-T0 - 18.06.2026.pdf
1.6 MB
15KK040 Dwg Reg 001_260714.pdf
192.2 KB
15KK040 HHP CS BCAR Inspection List P2_230530.pdf
313.6 KB
15KK040-C-000 Civil Notes-P1.pdf
646.2 KB
15KK040-C-030 SPA Fire Tender & Car-P2.pdf
454.8 KB
15KK040-C-050 External Details Sheet 1-Stormwater Manholes-P1.pdf
973.7 KB
15KK040-C-051 External Details Sheet 2-Gullies & Aco Drains-P1.pdf
465.4 KB
15KK040-C-052 External Details Sheet 3-S.W.Pipe Bedding Details-P1.pdf
853.7 KB
15KK040-C-053 External Details Sheet 4-Irish Water M.H Details-P1.pdf
551.2 KB
15KK040-C-054 External Details Sheet 5-Irish Water W.W Details-P1.pdf
701.8 KB
15KK040-C-055 External Details Sheet 6-Irish Water W.M Details-P1.pdf
426.8 KB
15KK040-C-056 External Details Sheet 7-Irish Water W.M Details-P1.pdf
366.1 KB
15KK040-C-057 External Details Sheet 8-Irish Water W.M Details-P1.pdf
366.0 KB
15KK040-C-058 External Details Sheet 9-Irish Water W.M Details-P1.pdf
372.2 KB
15KK040-C-059 External Details Sheet 10-Sections & Misc.Details-P2.pdf
357.5 KB
15KK040-C-060 External Details Sheet 11-Attenuation & Gen.Details-P1.pdf
712.8 KB
15KK040-C-061 External Details Sheet 12- Retaining Wall Details.pdf
328.6 KB
15KK040-C-075 Fixed Seating Details-P1.pdf
358.1 KB
15KK040-R-001 Foundation Rebar Sheet.pdf
198.1 KB
15KK040-R-002 Lift Pit.pdf
261.7 KB
15KK040-R-003 Lift Shaft RC Details.pdf
263.6 KB
15KK040-R-004 RC Details of Retaining Wall Sheet 1-P2.pdf
513.2 KB
15KK040-R-005 RC Details of Retaining Wall Shts-2.pdf
331.6 KB
15KK040-R-006 RC Details of Retaining Wall Shts-3.pdf
398.4 KB
15KK040-R-007 RC Details of Retaining Wall Shts-4.pdf
450.8 KB
15KK040-R-015 RC Details of Columns Shts-1.pdf
321.2 KB
15KK040-R-016 RC Details of Columns Shts-2.pdf
306.6 KB
15KK040-R-017 RC Details of Columns Shts-3.pdf
320.9 KB
15KK040-R-018 RC Details of Columns Shts-4.pdf
341.1 KB
15KK040-R-019 RC Details of Columns Shts-5.pdf
357.1 KB
15KK040-R-025 RC Details of RHPB's Sht-1.pdf
222.9 KB
15KK040-R-026 RC Details of RHPB's Sht-2.pdf
222.4 KB
15KK040-R-027 RC Details of RHPB's Sht-3.pdf
207.7 KB
15KK040-R-030 Ground Floor Beams Keyplan.pdf
386.9 KB
15KK040-R-031 RC Details of First Floor Beams- Sheet 1.pdf
286.7 KB
15KK040-R-032 RC Details of First Floor Beams- Sheet 2.pdf
251.5 KB
15KK040-R-033 RC Details of First Floor Beams- Sheet 3.pdf
272.1 KB
15KK040-R-040 Ground Floor Tie Rebar.pdf
436.8 KB
15KK040-R-050 Ground Floor Insitu Slab.pdf
257.7 KB
15KK040-R-060 Roof Floor Beams Keyplan.pdf
280.2 KB
15KK040-R-061 RC Details of Roof Floor Beams-Sheet 1-P2.pdf
274.8 KB
15KK040-R-062 RC Details of Roof Floor Beams-Sheet 2-.pdf
281.1 KB
15KK040-R-063 RC Details of Roof Floor Beams-Sheet 3-P2.pdf
286.0 KB
15KK040-R-064 RC Details of Roof Floor Beams-Sheet 4.pdf
262.9 KB
15KK040-R-065 RC Details of Roof Floor Beams-Sheet 5-P2.pdf
241.1 KB
15KK040-R-066 RC Details of Roof Floor Beams-Sheet 6.pdf
249.6 KB
15KK040-R-067 RC Details of Roof Floor Beams-Sheet 7.pdf
279.3 KB
15KK040-R-1000 RC Details of Retaining Wall (Civil) Sheet-01.pdf
339.3 KB
15KK040-R-1001 RC Details of Retaining Wall (Civil) Sheet-02.pdf
354.7 KB
15KK040-R-1002 RC Details of Retaining Wall Sheet 3-P2.pdf
263.2 KB
15KK040-R-1003 RC Details of Retaining Wall (Civil) Sheet-04.pdf
300.6 KB
15KK040-R-1004 RC Details of LPG Retaining Wall Sheet 1-P1.pdf
346.3 KB
15KK040-R-1005 RC Details of LPG Retaining Wall Sheet 2-P1.pdf
318.6 KB
15KK040-S-000 Structural Notes- P2.pdf
887.4 KB
15KK040-S-050 Sections & Details 1 Rev P3.pdf
697.1 KB
15KK040-S-051 Sections & Details 2-P3.pdf
510.7 KB
15KK040-S-052 Sections & Details 3-P3.pdf
497.1 KB
15KK040-S-053 Sections & Details 4-P3.pdf
641.4 KB
15KK040-S-054 Roof Details Sheet 1- P2.pdf
260.4 KB
15KK040-S-055 Roof Details Sheet 2- P2.pdf
305.2 KB
15KK040-S-057 Bed-Jnt Reinf - Detail Sht- P2.pdf
235.9 KB
15KK040-S-059 Typical Underpinning Details-P1.pdf
402.8 KB
15KK040-S-200 Proposed Sections-P2.pdf
975.4 KB
15KK040-S-201 Proposed Building Sections (Sheet 02 of 02)-P1.pdf
503.4 KB
2437-EF-01-AB-21.08.2025.pdf
716.3 KB
2437-EF-02-AB-21.08.2025.pdf
111.3 KB
3.4.2-HS-PSCS_v3.1-25-11-2025.docx
43.3 KB
AF1 - Stage 2b - Scoil Ruain MAY2026.pdf
189.2 KB
Appendix A_European Single Procurement Document.docx
58.8 KB · ESPD (European Single Procurement Document)
Appendix H - Green Public Procurement Templates.docx
307.7 KB · Appendix / Annex
Appendix_B1_List_of_Previous_Works_Projects_which_is_CEE.docx
31.3 KB · Appendix / Annex
Appendix_C_Bankers_Letter.docx
29.9 KB · Appendix / Annex
Appendix_D2_QW2_Letter_of_Undertaking_Bond.docx
26.8 KB · Appendix / Annex
Assignment of Builder [Article 9].pdf
181.3 KB
BCMS Cert of Completion.pdf
267.5 KB
Combined Schedule.pdf
1.1 MB
COMBINED.pdf
1.1 MB
D-15-136-01_ Site Location Map_1-2500_A3.pdf
395.3 KB
D-15-136-03_ Existing GAs_1-200_A1.pdf
620.9 KB
D-15-136-05_ Proposed Lower GF Plan_1-100_A1.pdf
2.9 MB
D-15-136-06_ Proposed Upper GF Plan_1-100_A1.pdf
3.0 MB
D-15-136-08_ Proposed Sections (1)_1-100_A1.pdf
494.5 KB
D-15-136-09_ Proposed Sections (2)_1-100_A1.pdf
548.1 KB
DAC-15-136_Scoil Ruain Killenaule_DAC Report_Rev A.pdf
389.3 KB
eXCEL.xlsx
58.7 KB
F-15-136-01_Site Location Map_1-2500_A3.pdf
396.0 KB
F-15-136-03_Existing GA's_1-200_A1.pdf
620.7 KB
F-15-136-06-A_Proposed Lower GF Plan_1-100_A1.pdf
3.0 MB
F-15-136-07-A_Proposed Upper GF Plan_1-100_A1.pdf
3.3 MB
F-15-136-09_Proposed Sections (1)_1-100_A1.pdf
653.3 KB
F-15-136-10-A_Proposed Sections (2)_1-100_A1.pdf
694.2 KB
F-15-136-11_Proposed Minimum Boundary Distances_1-150_A1.pdf
1.5 MB
F-15-136_Fire Cert-Application Report_Rev C.pdf
552.0 KB
Form of Undertaking by Builder [Article 9].pdf
187.8 KB
GRANTED DAC CERT.pdf
131.1 KB
GRANTED FSC CERT.pdf
141.6 KB
ITTW2-v3.1-25-11-2025.pdf
656.7 KB
Noelle -rebar.xlsx
61.4 KB
Note for Use of Alternative PD File.pdf
196.4 KB
P16064_ Rp_F01.pdf
19.3 MB
P16064_ Rp_Int_F01.pdf
4.4 MB
PSHP Stage 2b Scoil Ruain - MAY2026.pdf
433.6 KB
PW-CF1_v2.10_16-06-2026.pdf
980.1 KB
QW2_Part_1_v2.2_25-11-2025.pdf
701.0 KB
QW_Part_2_v1.1_18-11-2024.docx
58.7 KB
R-001 Schedule.pdf
53.8 KB
R-001 Weights.pdf
39.6 KB
R-002 Schedule.pdf
60.9 KB
R-002 Weights.pdf
40.2 KB
R-003 Schedule.pdf
62.1 KB
R-003 Weights.pdf
40.6 KB
R-004 Schedule.pdf
228.7 KB
R-005 Schedule.pdf
66.7 KB
R-005 Weights.pdf
40.7 KB
R-006 Schedule.pdf
61.2 KB
R-006 Weights.pdf
40.3 KB
R-007 Schedule.pdf
67.4 KB
R-007 Weights.pdf
40.5 KB
R-015 Schedule.pdf
59.7 KB
R-015 Weights.pdf
40.6 KB
R-016 Schedule.pdf
61.1 KB
R-016 Weights.pdf
40.8 KB
R-017 Schedule.pdf
66.8 KB
R-017 Weights.pdf
39.9 KB
R-018 Schedule.pdf
66.7 KB
R-018 Weights.pdf
41.1 KB
R-019 Schedule.pdf
68.2 KB
R-019 Weights.pdf
40.3 KB
R-025 Schedule.pdf
54.0 KB
R-025 Weights.pdf
39.5 KB
R-026 Schedule.pdf
54.5 KB
R-026 Weights.pdf
38.6 KB
R-027 Schedule.pdf
53.6 KB
R-027 Weights.pdf
38.1 KB
R-031 Schedule.pdf
67.3 KB
R-031 Weights.pdf
41.6 KB
R-032 Schedule.pdf
67.7 KB
R-032 Weights.pdf
41.0 KB
R-033 Schedule.pdf
67.7 KB
R-033 Weights.pdf
41.0 KB
R-040 Schedule.pdf
56.1 KB
R-040 Weights.pdf
38.6 KB
R-050 Schedule.pdf
54.5 KB
R-050 Weights.pdf
39.8 KB
R-061 Schedule.pdf
65.7 KB
R-061 Weights.pdf
39.3 KB
R-062 Schedule.pdf
66.2 KB
R-062 Weights.pdf
40.2 KB
R-063 Schedule.pdf
66.5 KB
R-063 Weights.pdf
39.7 KB
R-064 Schedule.pdf
65.8 KB
R-064 Weights.pdf
39.9 KB
R-065 Schedule.pdf
59.9 KB
R-065 Weights.pdf
39.4 KB
R-066 Schedule.pdf
65.8 KB
R-066 Weights.pdf
39.7 KB
R-067 Schedule.pdf
66.5 KB
R-067 Weights.pdf
40.6 KB
R-070 Schedule.pdf
55.2 KB
R-070 Weights.pdf
39.6 KB
R-071 Schedule.pdf
54.1 KB
R-071 Weights.pdf
39.1 KB
R-072 Schedule.pdf
52.7 KB
R-072 Weights.pdf
38.6 KB
R-1000 Schedule.pdf
59.9 KB
R-1000 Weights.pdf
39.6 KB
R-1001 Schedule.pdf
60.7 KB
R-1001 Weights.pdf
39.1 KB
R-1002 Schedule.pdf
54.7 KB
R-1002 Weights.pdf
39.7 KB
R-1003 Schedule.pdf
52.9 KB
R-1003 Weights.pdf
39.3 KB
R-1004 Schedule.pdf
55.2 KB
R-1004 Weights.pdf
39.3 KB
R-1005 Schedule.pdf
54.8 KB
R-1005 Weights.pdf
39.1 KB
Schedule of Maintenance & Warranties & Demonstrations.xlsx
17.2 KB · Appendix / Annex
Scoil Ruain, Killenaule Asbestos Survey Report PE16-591 28.6.2016.pdf
2.0 MB
T-15-136-01_Site Location Plan_A2.pdf
500.9 KB
T-15-136-03_ Existing GA_s_A1_1-200.pdf
415.3 KB
T-15-136-04_ Demolition GAs_A1.pdf
1.5 MB
T-15-136-06_Proposed Lower GF Plan_A1_1-100.pdf
1.4 MB
T-15-136-07_Proposed Upper GF Plan_A1_1-100.pdf
1.6 MB
T-15-136-11_Proposed Wall Sections & Details-Sheet 1_A1_1-25.pdf
3.7 MB
T-15-136-12_Proposed Wall Sections & Details-Sheet 2_A1_1-25.pdf
3.8 MB
T-15-136-13_Proposed Wall Sections & Details-Sheet 3_A1_1-25.pdf
3.5 MB
T-15-136-14_Proposed External Window Schedule_A1_1-25.pdf
369.5 KB
T-15-136-15_Proposed External Door Schedule_A1_1-25.pdf
740.5 KB
T-15-136-16_Proposed Internal Door Schedule_A1_1-25.pdf
500.9 KB
T-15-136-17_Proposed Curtain Wall-Rooflight Schedule_A1_1-25.pdf
359.2 KB
T-15-136-18_L.G.F Sanitary Schedule_A1_1-25.pdf
433.3 KB
T-15-136-19_U.G.F Sanitary Schedule-Staff Areas_A1_1-25.pdf
358.6 KB
T-15-136-20_U.G.F Sanitary Schedule-ASD Areas_A1_1-25.pdf
453.1 KB
T-15-136-21_Proposed FF ASD Classroom-Sluice-Music Room_A1.pdf
1.8 MB
T-15-136-22_Proposed FF Practical Activities-DLS-Staff_A1.pdf
1.9 MB
T-15-136-23_Proposed GF Reception-Staff Office-Meeting Room_A1_1-25.pdf
1.6 MB
T-15-136-24_Proposed Ramp-Stair Details_Sheet 1_A1_1-50.pdf
813.8 KB
T-15-136-25_Proposed Ramp-Stair Details_Sheet 2_A1x1M_1-50.pdf
1.1 MB
T-15-136-26_Proposed Internal Stairs_A1.pdf
589.3 KB
T-15-136-27_Proposed Roof Plan_A1_1-100.pdf
1.8 MB
T-15-136-29_Proposed Blind & Skirting locations_A1_1-100.pdf
1.3 MB
T-15-136-30_Proposed Architrave&Skirting Details_A4_1-2.pdf
240.8 KB
T-15-136-BC-01_BCAR Requirements.pdf
1.5 MB
T-15-136-EIS-01_External Ironmongery Schedule.pdf
398.2 KB
T-15-136-FS-01_INTERNAL FINISHES SCHEDULE.pdf
226.8 KB
T-15-136-FS-02_EXTERNAL FINISHES SCHEDULE.pdf
227.2 KB
T-15-136-IIS-01_Internal Ironmongery Schedule.pdf
638.9 KB
Tender Package.zip
182.7 MB
Tipperary ETB Green Public Procurement Policy.pdf
306.3 KB
Tips and hints for uploading tender responses.pdf
108.9 KB · Tender Response Template
Volume B - Tender & Schedule.pdf
1.0 MB
Original notice text
Tipperary ETB invites tenders or C1057 - Main Contractor - also assuming PSCS role for a Permanent Accommodation for 2 ASD Units, 1 Music Room and 5 General Class Rooms at Scoil Ruain, Killenaule, Thurles, Co Tipperary E41 XY95
AI analysis updated 14 hours, 21 minutes ago
Value
€1
Deadline
12 Oct
Location
Killenaule, Thurles, Co. Tipperary, Ireland
Procedure
Open
eTenders ID
8843560
Ask AI
Knows this tender's documents
Example only — sign up to ask about this tender